Shower is Finished

The frameless glass shower wall and door have been installed. I had the glass company place a floating robe hook on the shower wall next to the door, so I could easily grab a towel when I get out of the shower. Also, on the glass front, the new bathroom window has been installed.

All the shower plumbing fixtures have also been installed. Most of the fixtures come from Grohe’s Atrio line. There is an multifunction rain shower head placed in the ceiling and a handheld shower head on a adjustable bar. In the photo below, the valve on the far left is the thermostatic valve that adjust the temperature for both shower heads. Then on the right are the flow valves that turn the shower heads on, the top one for the overhead head and the lower one for the handheld head. Thermostatic valves are a really nice feature because you don’t have to constantly find the right temperature in between showers, and they ensure the same temperature water comes out of multiple heads. I have already used my new shower, and it is glorious! The area is wonderful, nice and spacious but not so big to be insane, and the the bench is a necessity for any woman who shaves her legs.

Shower fixtures

Shower fixtures

Shower glass wall and door

Shower glass wall and door

Shower glass wall robe hook

Shower glass wall robe hook

Shower glass wall and door

Shower glass wall and door

Shower glass wall and door in place

Shower glass wall and door in place

New window

New window

2 Replies to “Shower is Finished”

  1. Pingback: Master Bathroom Renovation Is Finished! | Geeky Girl Engineer